• roche logo
FLOW Solution

Enhance your efficiency

Increase Turnaround Time with FLOW Classic

Stagger up to 4 FLOW runs over an 8-hour day. Each FLOW run takes approximately 4 hours, but when the purification of the first run is finished (after the first 1.5 hours) a new workflow can start.

Enable processing of up to 384 Samples and report more than 2000 results in a single day.

flow-classic-staggered-runs-timeline


Efficiency: Increase Throughput with the FLOW

FLOW Flex: Stagger up to 3 FLOW runs over a 9-hour day. Each FLOW run** takes approximately 4 hours, but when the purification of the first run is finished (after the first 2.5 hours) a new workflow can start.

Enable processing of up to 288 samples and report more than 1400 results in a single day.

flow-flex-staggered-runs-timeline